| |
Over Metal Deck w/ Rigid Insulation |
| |
Construction No. 238B |
24 gauge panels. 22 gauge metal deck is required. Light transmitting panels are not available. Rigid insulation plywood or OSB and gypsum wallboard are optional. |
| |
Construction No. 451 |
24 gauge panels. Tectum "Type E" or "Type III" is required. |
| |
Construction No. 487 |
24 gauge panels. Loadmaster system is required. Rigid insulation is optional. |
| |
Over Purlins & Joists |
| |
Construction No. 176 |
24 gauge panels. Clips are not used. Panels are thru-fastened to purlins. |
| |
Construction No. 180 |
24 gauge panels. Light transmitting panels are available. Rigid insulation and a liner panel are optional. |
| |
Construction No. 449 |
24 gauge panels. Special dome skylight is available. |
| |
Construction No. 90 |
24 gauge panels. Light transmitting panels are available. |
| |
Over Wood Deck |
| |
Construction No. 437 |
24 gauge panels. 5/8" plywood deck or OSB is required. |
| |
Construction No. 452 |
24 gauge panels. 2 x 6 Tongue and Groove is required. Rigid insulation is optional. |